Activities

  1. Official Kick-off meeting, Irbid, Jordan, 22nd of April 2010Photo 1
  2. Press Releases:
  3. Visit to Rwaished on 31st August 2010 (Summary of the outcome of the visitphoto 1, photo 2)
  4. Qualitative characteristics of the brackish water that will be used in the desalination unit
  5. Photos of the innovative and autonomous system for the production of potable water during the trial operation and optimization in Greece (Picture 1Picture 2, Picture 3,Picture 4Picture 5)
  6. Photos from the transportation of the system from Aqaba to Rwaished
  7. Videos & Photos from the installation activities of the system for the treatment of brackish water in Rwaished, Jordan, in October 2012
  8. Photos of the installed system for the treatment of brackish water in Rwaished, Jordan, in October 2012
  9. Location of the installed autonomous system for the production of drinking water via Google Earth
  10. Leaflet for summarizing the project activities
  11. Fresh water and Energy Production Hybrid System Leaflet
  12. Dissemination of the final one-day event at the Land Mark Hotel in Amman on Monday 22nd April 2013
  13. Photos of the installed system for the treatment of brackish water in Rwaished, Jordan, April 2013
  14. Press Releases after the final one-day event at the Landmark Hotel in Amman on Monday 22nd April 2013:
  15. Deliverables
    • Deliverable 1.1: Report on the existing situation on water resources sector, the quantity & characteristics of brackish water & the existing situation about its management in Jordan
    • Deliverable 1.2: Jordanian and European Water Legislation and Policy
    • Deliverable 2: Report for the review and comparative evaluation of the technologies that are applied worldwide for the treatment of brackish water
    • Deliverable 5: Operation of the pilot system
    • Deliverable 6.1: Optimization of the operation of the brackish water treatment system in Jordan
    • Deliverable 6.2: Report for the technical effectiveness and financial viability of the RO-RES pilot system for treating brackish water
    • Deliverable 7.1: Techno-economic study for the application of the pilot system
    • Deliverable 7.2: Technical report including guidelines – suggestions to implement the BRAWA’ system on a larger scale covering the needs of other areas in Jordan or other Mediterranean regions